Belfast Tidal Flood Alleviation Scheme

The city of Belfast finds itself at risk of flooding from a number of sources. A coastal city on the mouth of the river Lagan, both tidal and river flooding present a risk to the businesses and residents.

Belfast Tidal Flood Alleviation Scheme

MARKET

UK Public Sector

CUSTOMER

Department of Infrastructure

Tidal flood risk is of most concern, with approximately 560 residential and 460 non-residential properties currently at risk from a significant tidal event.

As part of a two year, £18 million flood defence investment that began the construction phase in August 2022, MM Engineering were commissioned to work alongside a consortium of stakeholders to provide a range of flood defence products including flood gates, glazing and flood wall design to support this busy capital city community.

Flood defence on this scale required a number of bespoke options. Our bank of tidal defence experience have allowed us to create bespoke flood glazing that is both thinner and more attractive than off-the-shelf glazing products. involved the construction of an in-house testing facility, currently dedicated to the testing.

Flood barrier with glass panels and sliding steel gate along a riverside walkway with cranes beyond

Critically, our ability to provide in-house design, UK manufacture alongside full installation of flood defensive products ensures we are able to remain agile to the client’s requirements, designing and installing products across a large coastal area that off-the-shelf solutions and providers would struggle to keep up with.

As unique challenges arose, our team adapted design work. Shallow underground services in installation locations limited excavations to 300mm and took our design team back to the drawing board, redesigning and retesting prototypes of planned flood gates at our UK site, where dedicated in-house testing facility has been installed specifically to test prototypes up to a 10KN water weight load for the Belfast Tidal Flood Alleviation Scheme - saving the client months in lead times between design, testing and install.

Construction phase continues in Belfast, with further install of flood gates and over 500m of flood glazing planned for install as the project continues.

Glass flood wall along a cobbled riverside walkway with cranes across the water
Glass flood wall panels with metal posts beside a cobbled quay and drainage channel
Long run of glass flood barrier panels along a river quay with street lamp
Curved glass flood wall on a quayside with orange buoys and a solar-panelled building
Curving glass flood wall along a paved waterfront with a moored boat and bridge
Glass flood wall with steel posts overlooking orange buoys, river and bridge in low sun
Glass flood wall enclosing a paved dockside beside a harbour basin and lifting bridge
Close view of glass flood wall panels with steel posts above a dock, autumn leaves on paving
Glass flood wall running along stepped dock edge beside lawn and benches